Zelya Energy

Future wind farm operators must produce a hazard study file in their application for operating a Classified Installation for the Protection of the Environment (ICPE).

This is an obligation resulting from article R512-1 of the Environment Code, while article R512-9 of the same code describes the content.

In certain cases, and as needed, this hazard study needs to be updated.

Our services

Zelya Energy supports you in the establishment or update of the hazard study file:

  • writing of the non-technical summary;
  • development of risk mapping;
  • description and analysis of installations, environment and vicinity;
  • identification, characterisation and reduction of hazard potentials;
  • analysis of accidentology;
  • risk assessment;
  • modelling of dangerous phenomena;
  • analysis of possible domino effects;
  • presentation of organizational and management measures.

We compile the hazard study file with you in close consultation with the prefectural administration (DREAL and DGPR) and supplement it with aspects specific to your project.

We ensure the hazard study is in compliance with relevant regulatory provisions (decrees, orders, circulars, etc.), as well as taking into account the formalized recommendations of the profession and best practices.